How to calculate pacing to a monthly goal in Excel
Formula (Excel and Google Sheets)
=(C2/B2)/(DAY($G$1)/DAY(EOMONTH($G$1,0)))Compare progress with the share of the month gone: =(C2/B2)/(DAY($G$1)/DAY(EOMONTH($G$1,0))). Above 100% means ahead of pace.
- Result on the example
- one result per row in
D2, filled down toD6 - Works in
- Every current version
- Google Sheets
- Same formula
See it work
The formula is already in D2, filled down to D6. Change any input and the result updates, or edit the formula to experiment.
How it works
On March 12, 12 of 31 days have passed: 38.7% of the month. DAY(EOMONTH($G$1,0)) gives the number of days in the month. Ana has 42% of her goal, so she is pacing at 42 / 38.7 = 108.5%: on track to beat it. Ben, at 77.5%, would finish short if nothing changes.
=(C2/B2)/(DAY($G$1)/DAY(EOMONTH($G$1,0)))Result1.085
C2$21,000The value in C2.
B2$50,000The value in B2.
C2/B20.42The / operator divides.
$G$13/12/2026The value in G1.
DAY($G$1)12DAY: Day of the month, 1–31.- serial_number
$G$13/12/2026
- serial_number
EOMONTH($G$1,0)3/31/2026 (46112)EOMONTH: Last day of the month, months away.- start_date
$G$13/12/2026 - months
0
- start_date
DAY(EOMONTH($G$1,0))31DAY: Day of the month, 1–31.- serial_number
EOMONTH($G$1,0)3/31/2026 (46112)
- serial_number
DAY($G$1)/DAY(EOMONTH($G$1,0))0.3870967742The / operator divides.
C2/B2)/(DAY($G$1)/DAY(EOMONTH($G$1,0))1.085The / operator divides.
In Google Sheets
The same formula works in Google Sheets: =(C2/B2)/(DAY($G$1)/DAY(EOMONTH($G$1,0))). We ran it in Google Sheets mode on the same data and it returns the same results.
Other ways to do it
Each one was run on the same example sheet.
| Formula | Result | When to use it |
|---|---|---|
| =C2/(DAY($G$1)/DAY(EOMONTH($G$1,0)))/B2 | 108.5%, 77.5%, 100.1%… | Projects the month-end total first (sales ÷ share of month gone), then divides by the goal. Same result. |
Common mistakes
- Calendar days assume sales happen evenly every day. For a business that sells on weekdays only, use
NETWORKDAYSfor the elapsed and total days. - Early in the month the pace swings wildly; a big order on day 2 can show 500%.
Try it yourself
Same data, empty answer cell. Your formula is graded instantly, then re-checked on changed data, so a typed-in number won't pass.
Calculate pacing to a monthly goal
D2, calculate how each rep is pacing: progress toward the goal divided by the share of the month that has passed as of G1, then fill down to D6.Questions
How do I project the month-end total?
Divide sales to date by the share of the month gone: =C2/(DAY($G$1)/DAY(EOMONTH($G$1,0))).
How much does the rep need per remaining day?
=(B2-C2)/(EOMONTH($G$1,0)-$G$1) gives the daily amount needed for the rest of the month.