Spreadsheet Practice

How to count dates by week in Excel

Formula (Excel and Google Sheets)

=COUNTIFS($B$2:$B$13,">="&E2,$B$2:$B$13,"<"&E2+7)

List each week's start date and count the seven days from it: =COUNTIFS($B$2:$B$13,">="&E2,$B$2:$B$13,"<"&E2+7), filled down.

Result on the example
one result per row in F2, filled down to F5
Works in
Every current version
Google Sheets
Same formula

See it work

The formula is already in F2, filled down to F5. Change any input and the result updates, or edit the formula to experiment.

How it works

A week is the seven days from its start date: on or after the Monday in column E and before the next Monday, E2+7. COUNTIFS counts the order dates in that window. The order column is locked with $ while E2 moves down to the next week.

The Sunday orders (March 8, 15 and 29) belong to the week that started the Monday before.

=COUNTIFS($B$2:$B$13,">="&E2,$B$2:$B$13,"<"&E2+7)

Result3

  1. $B$2:$B$1312 rows × 1 col: Mar 2, 2026, Mar 4, 2026, Mar 8, 2026, Mar 9, 2026, …

    A range: 12 cells in one column.

  2. E2Mar 2, 2026

    The value in E2.

  3. ">="&E2">=46083"

    The & operator joins as text.

  4. E2+746090

    The + operator adds.

  5. "<"&E2+7"<46090"

    The & operator joins as text.

  6. COUNTIFS($B$2:$B$13,">="&E2,$B$2:$B$13,"<"&E2+7)3

    COUNTIFS: Counts rows that meet every condition.

    • criteria_range1$B$2:$B$1312 rows × 1 col: Mar 2, 2026, Mar 4, 2026, Mar 8, 2026, Mar 9, 2026, …
    • criteria1">="&E2">=46083"
    • criteria_range2$B$2:$B$1312 rows × 1 col: Mar 2, 2026, Mar 4, 2026, Mar 8, 2026, Mar 9, 2026, …
    • criteria2"<"&E2+7"<46090"

In Google Sheets

The same formula works in Google Sheets: =COUNTIFS($B$2:$B$13,">="&E2,$B$2:$B$13,"<"&E2+7). We ran it in Google Sheets mode on the same data and it returns the same results.

Other ways to do it

Each one was run on the same example sheet.

FormulaResultWhen to use it
=SUMPRODUCT(--($B$2:$B$13-WEEKDAY($B$2:$B$13,2)+1=E2))3, 4, 2…Works out the Monday of each order's week and compares it with E2. The same idea gives a "week of" helper column: =B2-WEEKDAY(B2,2)+1.

Common mistakes

  • Week numbers from WEEKNUM depend on the system: type 1 starts weeks on Sunday, type 2 on Monday, and ISO weeks (ISOWEEKNUM) can put early January in week 52 or 53. Week start dates avoid the confusion.
  • For weeks starting on Sunday, use WEEKDAY(B2,1) in the helper formula and Sunday dates in column E.

Try it yourself

Same data, empty answer cell. Your formula is graded instantly, then re-checked on changed data, so a typed-in number won't pass.

Count dates by week

In F2, count the orders in the week that starts on E2, then fill down to F5.

Questions

How do I get the week start dates automatically?

Put the first Monday in E2 and use =E2+7 in E3, filled down.

How do I count by week number instead?

Add a helper column with =ISOWEEKNUM(B2) and count it with COUNTIF.

Checked by running on 2026-10-30: every formula and result on this page was calculated by the Spreadsheet Practice formula engine, in both Excel and Google Sheets modes.